We are pouring the footer. Into the mixer go three buckets of gravel, two of sand, and one of Portland cement. It is all spun together and then water is added. It too about 15 batches to fill up to the required 8" inches of concrete.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment